Russo Corporation is drilling the foundation for the new Station building. There are about 70 holes that are being drilled, with some over 50 ft deep. They are about 2/3 finished. The thing you can note in this view is that the 3 oak trees that were planted by the L&N in front of the 1960s station are now gone. |
Date:
4/7/2015 |
Location:
Birmingham, AL Map  |
Views:
197 |
Collection Of:

Bob Hasty |
|
Author: Bob Hasty
|
 |
Picture Categories: Station,Passenger |
This picture is part of album: Birmingham Intermodal Station |